NASCLA Commercial General Building Calculations Practice

Each problem shows the formula, the numbers and every step. The app generates new problems without limit.
Question 1
Calculation
An activity has an early start of day 12, a late start of day 18 and a duration of 5 days. What is its total float?
Question 2
Calculation
A trench is 8 ft deep in Type B soil and is sloped at 1:1 (given) on both sides. If the bottom is 4 ft wide, how wide is the top?
Question 3
Calculation
A slab on grade is 5 inches thick. Using a joint depth of one-quarter of the slab thickness (given), how deep should the saw cut be?
Question 4
Calculation
Using 1.125 standard 8 x 16 blocks per square foot of wall (given), how many blocks are needed for a wall 80 ft long and 12 ft high with no openings, before waste?
Question 5
Calculation
Fourteen W12x26 beams are each 30 ft long. What is their total weight in tons (2,000 lb per ton)?
Question 6
Calculation
How many board feet are in one 2x6 that is 12 ft long?
Question 7
Calculation
A low-slope roof measures 120 ft by 85 ft. How many squares of membrane is that, before waste and laps?
Question 8
Calculation
A room has four walls, each 20 ft long and 10 ft high, with no openings. How many 4 ft x 10 ft gypsum boards are needed for one layer on the inside of the walls, before waste?
Question 9
Calculation
A building's cooling load is 540,000 Btu/h. What is the required capacity in tons?
Question 10
Calculation
A temporary heater draws 12.5 amperes at 240 volts. Using P = V × I, what is its power?
Question 11
Calculation
A contractor's bid is $2,400,000 and the bid documents require a 5% bid bond. What is the bond amount?
Question 12
Calculation
Activity A (4 days) and activity B (6 days) both start on day 0. Activity C (3 days) can start only when both A and B are finished. In a forward pass, what is C's early finish?
Question 13
Calculation
A basement excavation measures 60 ft by 40 ft by 6 ft deep in bank measure. How many bank cubic yards (BCY) is that?
Question 14
Calculation
A slab is 40 ft by 30 ft by 4 inches thick. How many cubic yards of concrete does it need, before waste?
Question 15
Calculation
A CMU wall is 60 ft long and 10 ft high and has two openings of 3 ft by 7 ft and one of 6 ft by 4 ft. Using 1.125 blocks per square foot (given), how many blocks are needed before waste?
Question 16
Calculation
A steel plate is 1/2 inch thick, 24 inches wide and 10 ft long. Steel weighs about 490 lb per cubic foot (given). What does the plate weigh?
Question 17
Calculation
An order is 80 pieces of 2x10 joists, each 16 ft long. How many board feet is that?
Question 18
Calculation
A roof rises 6 inches for every 12 inches of horizontal run. What is its slope expressed as a percent?
Question 19
Calculation
A paint covers 350 sq ft per gallon per coat (given). How many gallons are needed for two coats on 2,800 sq ft of wall?
Question 20
Calculation
A 3-inch building drain runs 80 ft at 1/4 inch per foot. How much total fall does it have?

Ready for the real exam?

Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.
PrivacyTerms
© 2026 Trovyn Tech LLC