Estimating & bidding: Utah Contractor Business & Law Practice Questions
Takeoffs, unit costs, overhead and profit, markup vs. margin, bid documents, addenda, alternates, bid mistakes and bid bonds.
Often missed
Question 1
What is a quantity takeoff?
Correct answer: Measuring and listing the materials and work items shown on the plans
General estimating practice
The takeoff counts and measures everything in the drawings and specifications (cubic yards, square feet, linear feet, each). Prices are applied to those quantities later.
Question 2
Which of these is a direct job cost?
Correct answer: Lumber for the framing
General estimating practice
Direct costs are labor, materials, equipment and subcontracts that go into a specific job. Office rent, office salaries and accounting are general overhead shared by all jobs.
Question 3
A job trailer, temporary toilets and a site superintendent used only on one project are best classified as what?
Correct answer: Job overhead (general conditions) for that project
General estimating practice
Costs that exist only because of a particular project but are not part of a specific work item are job overhead, often called general conditions. They belong in that job's estimate.
Question 4
A contractor's job cost is $80,000 and it adds a 15% markup on cost. What is the bid price?
Correct answer: $92,000
General estimating practice
Markup is applied to cost: $80,000 x 1.15 = $92,000. Dividing by 0.85 ($94,118) would give a 15% margin on the selling price, which is a different calculation.
Question 5
A contractor wants a 20% gross margin on the selling price. What markup on cost produces that margin?
Correct answer: 25%
General estimating practice
Markup = margin / (1 - margin) = 0.20 / 0.80 = 25%. For example, cost $100 x 1.25 = $125 price; profit $25 is 20% of $125.
Question 6
A job sells for $250,000 and costs $210,000. What is the gross margin as a percentage of the selling price?
Correct answer: 16%
General estimating practice
Gross profit is $250,000 - $210,000 = $40,000. Margin is $40,000 / $250,000 = 16%. The 19% figure is the markup on cost ($40,000 / $210,000).
Question 7
A slab is 30 ft by 40 ft and 4 in thick. About how many cubic yards of concrete does it need, before waste?
Correct answer: 14.8 cubic yards
General estimating practice
30 x 40 x (4/12) = 400 cubic feet. 400 / 27 = 14.8 cubic yards. Estimators then add a waste allowance.
Question 8
A takeoff shows 2,000 square feet of drywall and the estimator uses a 10% waste factor. How much should be priced?
Correct answer: 2,200 square feet
General estimating practice
2,000 x 1.10 = 2,200 square feet. The waste factor covers cutting, breakage and offcuts.
Question 9
What does labor burden add to an employee's base wage in an estimate?
Correct answer: Employer payroll taxes, insurance and benefits tied to that labor
General estimating practice
Labor burden is the employer's extra cost per hour: its share of FICA, FUTA and state unemployment tax, workers' compensation, liability insurance tied to payroll, and benefits. Income tax withholding comes out of the employee's pay and is not an employer cost.
Question 10
A crew will need 120 labor hours at $30 per hour, and labor burden is 35% of wages. What is the estimated labor cost?
Correct answer: $4,860
General estimating practice
Wages are 120 x $30 = $3,600. Burden is $3,600 x 0.35 = $1,260. Total labor cost is $4,860.
Question 11
A finisher installs 40 square feet of tile per hour. How many hours are needed for 1,000 square feet?
Correct answer: 25 hours
General estimating practice
Hours = quantity / production rate = 1,000 / 40 = 25 hours. Production rates turn takeoff quantities into labor hours.
Question 12
What is an addendum during bidding?
Correct answer: A written change or clarification to the bid documents issued before bids are due
General estimating practice
Addenda modify the plans, specifications or bid instructions before bid opening. Bidders usually must acknowledge every addendum on the bid form, or the bid may be rejected.
Question 13
A bid form asks for a base bid plus a price to upgrade the flooring. What is that upgrade price called?
Correct answer: An alternate
General estimating practice
An alternate is a separately priced option the owner may accept or reject when awarding the contract. An allowance is a set amount carried in the bid for an item not yet selected.
Question 14
The specifications carry a $5,000 allowance for light fixtures the owner has not chosen. The owner picks fixtures costing $6,200. What usually happens?
Correct answer: The contract sum is adjusted for the $1,200 difference
General estimating practice
An allowance is a placeholder. When the real cost is known, the contract sum goes up or down by the difference, usually through a change order.
Question 15
What is a unit-price bid?
Correct answer: Prices per unit of work, paid on the quantities actually installed
General estimating practice
Unit pricing is common on site work and roads where quantities are uncertain. Payment is the unit price times the measured quantity.
Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.