Type III leak repair rules: EPA 608 Practice Questions

82.157 thresholds and deadlines applied to chillers.
Question 1
An office building chiller holds 600 lb of R-123. What leak-rate threshold triggers repair?
Question 2
A low-pressure chiller that cools a chemical plant's process holds 900 lb of R-123. What is its leak-rate threshold?
Question 3
A new chiller holds 700 lb of R-1233zd(E). Do the 82.157 leak repair requirements apply?
Question 4
A comfort cooling R-123 chiller exceeds its threshold. How long does the owner normally have to repair the leaks?
Question 5
After a successful initial verification test on a repaired R-123 chiller, when is the follow-up verification test due?
Question 6
The owner of a leaking R-123 chiller chooses to replace it instead of repairing it. What is required?
Question 7
An R-123 chiller lost 130% of its full charge last calendar year. What report is required?
Question 8
How long must the owner of a covered chiller keep leak inspection and repair records?
Question 9
A chiller's purge unit sends its exhaust to a destruction device rated at 99% efficiency. How is that purged refrigerant treated in the leak-rate calculation?
Question 10
A leaking R-123 chiller is evacuated to atmospheric pressure and shut down for the winter. What is this called, and how does it affect repair deadlines?

Ready for the real exam?

Get every question, unlimited calculation practice and timed mock exams in the app.
Coming soon
Download on the App Store
Coming soon
Get it on Google Play
Not affiliated with any state agency, TDLR, PSI, NFPA, EPA or CSLB. NEC® and National Electrical Code® are registered trademarks of NFPA.
Practice questions are written in our own words and cite code sections by number. Always study from your own copy of the code and the official candidate bulletin.
PrivacyTerms
© 2026 Trovyn Tech LLC